1000 gpm (200 MMscfd) Amine Plant (New Surplus)

¥483,116.00 CNY
Shipping calculated at checkout.

200 MMSCFD Amine Gas Sweetening Plant

New Surplus 1000 GPM Amine Regeneration Facility

This surplus 200 MMSCFD Amine Gas Sweetening Plant was originally designed for large-scale natural gas treating applications requiring acid gas removal and pipeline-quality gas production. The facility includes a complete 1000 GPM amine regeneration system with major process vessels, filtration, heat recovery, cooling, pumping, and heat medium oil systems.

Original Design Capacity

  • Gas Capacity: 200 MMSCFD
  • Amine Circulation Rate: 1000 GPM
  • Application: Natural gas sweetening, CO₂ reduction, and H₂S removal
  • Status: New surplus / available for relocation

Key Features

  • Originally designed for 200 MMSCFD
  • Complete 1000 GPM amine regeneration facility
  • 108" diameter amine contactor and amine still
  • Koch-Glitsch tower internals
  • Triple 600 HP Baker Hughes amine circulation pumps
  • Dual amine still reboilers
  • Full amine filtration and carbon treatment package
  • Heat medium oil system with 85 MMBtu/hr heater
  • Modular skid-based design for relocation and redevelopment
  • Original P&IDs and equipment documentation available

Major Equipment & Dimensions

Tag Equipment Size / Duty Skid Vendor
T-521 Amine Contactor 108" ID x 58'-0" Off-Skid Fabwell / Koch-Glitsch Internals
T-522 Amine Still 108" ID x 74'-0" S/S Off-Skid Curtis Kelly / Koch-Glitsch Internals
F-421 Inlet Gas Filter / Coalescer 42" OD x 12'-8" S/S On-Skid KMI Fabricators
V-422 Amine Flash Tank 96" ID x 35'-0" S/S On-Skid Fabwell
F-423 Rich Amine Filter 42" OD x 4'-8" S/S On-Skid KMI Fabricators
F-424 Amine Charcoal Pre-Filter 18" OD x 4'-8" S/S On-Skid KMI Fabricators
F-425 Amine Charcoal Filter 72" ID x 10'-0" S/S On-Skid Fabwell
V-426 Still Reflux Accumulator 60" ID x 10'-0" S/S On-Skid Davco
V-427 Treated Gas Scrubber 84" ID x 15'-0" S/S Off-Skid APF
F-428 Amine Charcoal After-Filter 18" OD x 4'-8" S/S On-Skid KMI Fabricators
V-482 Flash Gas Scrubber 12 3/4" OD x 4'-0" S/S Off-Skid Davco
V-483 HMO Expansion Tank 66" ID x 24'-0" S/S On-Skid Davco
E-222 Lean / Rich Amine Exchanger 35,510 MBtu/hr / 23" x 86" x 76" PHE On-Skid TMEC
E-224 Amine Still Reboiler 35,450 MBtu/hr / 50-192 NEN Off-Skid Fabsco
E-225 Amine Still Reboiler 35,450 MBtu/hr / 50-192 NEN Off-Skid Fabsco
A-321 Lean Amine Cooler 40,646,000 MBtu/hr / 3 Bays / (9) 40 HP Off-Skid Smithco
A-322 Amine Still Reflux Condenser 20,780,000 MBtu/hr / 2 Bays / (4) 30 HP Off-Skid Smithco
A-323 Treated Gas Cooler 6,365,300 MBtu/hr / 1 Bay / (2) 40 HP Off-Skid Smithco
P-621 / P-622 Amine Booster Pumps 1192.8 / 50 HP each On-Skid Allesco
P-623 / P-624 / P-625 Amine Circulation Pumps 559.9 / 600 HP each Off-Skid Baker Hughes
P-626 / P-627 Amine Reflux Pumps 39.2 / 7.5 HP each On-Skid Allesco
P-628 Chemical Injection Pump 6.0 / 1/3 HP On-Skid Best Pump
P-681 / P-682 / P-683 / P-684 HMO Pumps 2294.0 / 125 HP each On-Skid Allesco
H-782 HMO Heater 85,080 MBtu/hr Off-Skid OPF

Typical Applications

  • Natural gas sweetening
  • CO₂ removal
  • H₂S removal
  • Pipeline specification gas production
  • Midstream gas processing
  • LNG feed gas preparation
  • NGL recovery plant feed conditioning
  • Refinery and industrial fuel gas treating

Benefits

Reduced Project Schedule

A significant portion of the major process equipment has already been engineered and fabricated, helping reduce project schedule compared to a new-build amine treating facility.

Capital Cost Advantage

Surplus process plants can offer a substantial cost advantage compared to newly fabricated equipment, while still providing a strong foundation for redevelopment, modernization, or relocation.

Large-Scale Treating Capability

With an original design capacity of 200 MMSCFD, a 1000 GPM circulation rate, 108" diameter towers, and high-horsepower circulation pumps, this plant is suitable for major gas treating and midstream processing projects.

Redevelopment Flexibility

The modular skid-based configuration allows the facility to be evaluated for relocation, refurbishment, debottlenecking, process conversion, or integration into a larger gas processing development.

Available Engineering Support

  • Process review and suitability assessment
  • Capacity verification
  • Equipment inspection support
  • Modification planning
  • Instrumentation and controls upgrade planning
  • Relocation and reassembly support
  • Commissioning and startup assistance

Important Note

This is a surplus process facility. Final capacity, operating conditions, amine type, equipment condition, code compliance, and project suitability should be confirmed through detailed engineering review. Drawings, P&IDs, and equipment documentation are available for qualified purchasers.

Request Additional Information

Contact Big Iron Flow Control for pricing, inspection opportunities, equipment documentation, and engineering support related to this surplus 200 MMSCFD amine gas sweetening plant.

Payment & Security

Payment methods

  • American Express
  • Apple Pay
  • Bancontact
  • Diners Club
  • Discover
  • Google Pay
  • iDEAL Wero
  • Mastercard
  • Shop Pay
  • Visa

Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.

Big Iron Flow Control

1000 gpm (200 MMscfd) Amine Plant (New Surplus)

¥483,116.00 CNY

200 MMSCFD Amine Gas Sweetening Plant

New Surplus 1000 GPM Amine Regeneration Facility

This surplus 200 MMSCFD Amine Gas Sweetening Plant was originally designed for large-scale natural gas treating applications requiring acid gas removal and pipeline-quality gas production. The facility includes a complete 1000 GPM amine regeneration system with major process vessels, filtration, heat recovery, cooling, pumping, and heat medium oil systems.

Original Design Capacity

Key Features

Major Equipment & Dimensions

Tag Equipment Size / Duty Skid Vendor
T-521 Amine Contactor 108" ID x 58'-0" Off-Skid Fabwell / Koch-Glitsch Internals
T-522 Amine Still 108" ID x 74'-0" S/S Off-Skid Curtis Kelly / Koch-Glitsch Internals
F-421 Inlet Gas Filter / Coalescer 42" OD x 12'-8" S/S On-Skid KMI Fabricators
V-422 Amine Flash Tank 96" ID x 35'-0" S/S On-Skid Fabwell
F-423 Rich Amine Filter 42" OD x 4'-8" S/S On-Skid KMI Fabricators
F-424 Amine Charcoal Pre-Filter 18" OD x 4'-8" S/S On-Skid KMI Fabricators
F-425 Amine Charcoal Filter 72" ID x 10'-0" S/S On-Skid Fabwell
V-426 Still Reflux Accumulator 60" ID x 10'-0" S/S On-Skid Davco
V-427 Treated Gas Scrubber 84" ID x 15'-0" S/S Off-Skid APF
F-428 Amine Charcoal After-Filter 18" OD x 4'-8" S/S On-Skid KMI Fabricators
V-482 Flash Gas Scrubber 12 3/4" OD x 4'-0" S/S Off-Skid Davco
V-483 HMO Expansion Tank 66" ID x 24'-0" S/S On-Skid Davco
E-222 Lean / Rich Amine Exchanger 35,510 MBtu/hr / 23" x 86" x 76" PHE On-Skid TMEC
E-224 Amine Still Reboiler 35,450 MBtu/hr / 50-192 NEN Off-Skid Fabsco
E-225 Amine Still Reboiler 35,450 MBtu/hr / 50-192 NEN Off-Skid Fabsco
A-321 Lean Amine Cooler 40,646,000 MBtu/hr / 3 Bays / (9) 40 HP Off-Skid Smithco
A-322 Amine Still Reflux Condenser 20,780,000 MBtu/hr / 2 Bays / (4) 30 HP Off-Skid Smithco
A-323 Treated Gas Cooler 6,365,300 MBtu/hr / 1 Bay / (2) 40 HP Off-Skid Smithco
P-621 / P-622 Amine Booster Pumps 1192.8 / 50 HP each On-Skid Allesco
P-623 / P-624 / P-625 Amine Circulation Pumps 559.9 / 600 HP each Off-Skid Baker Hughes
P-626 / P-627 Amine Reflux Pumps 39.2 / 7.5 HP each On-Skid Allesco
P-628 Chemical Injection Pump 6.0 / 1/3 HP On-Skid Best Pump
P-681 / P-682 / P-683 / P-684 HMO Pumps 2294.0 / 125 HP each On-Skid Allesco
H-782 HMO Heater 85,080 MBtu/hr Off-Skid OPF

Typical Applications

Benefits

Reduced Project Schedule

A significant portion of the major process equipment has already been engineered and fabricated, helping reduce project schedule compared to a new-build amine treating facility.

Capital Cost Advantage

Surplus process plants can offer a substantial cost advantage compared to newly fabricated equipment, while still providing a strong foundation for redevelopment, modernization, or relocation.

Large-Scale Treating Capability

With an original design capacity of 200 MMSCFD, a 1000 GPM circulation rate, 108" diameter towers, and high-horsepower circulation pumps, this plant is suitable for major gas treating and midstream processing projects.

Redevelopment Flexibility

The modular skid-based configuration allows the facility to be evaluated for relocation, refurbishment, debottlenecking, process conversion, or integration into a larger gas processing development.

Available Engineering Support

Important Note

This is a surplus process facility. Final capacity, operating conditions, amine type, equipment condition, code compliance, and project suitability should be confirmed through detailed engineering review. Drawings, P&IDs, and equipment documentation are available for qualified purchasers.

Request Additional Information

Contact Big Iron Flow Control for pricing, inspection opportunities, equipment documentation, and engineering support related to this surplus 200 MMSCFD amine gas sweetening plant.

View product